Estimates subdivision horizontal development costs including grading, roads, utilities, drainage, and permits with contingency
By Kian Rahmanian, licensed California real estate professional
The Horizontal Infrastructure Cost Calculator estimates subdivision horizontal development costs including grading, roads, utilities, drainage, and permits with contingency. Enter your own numbers or keep the preset values, then press Calculate to see your results instantly.
The Horizontal Infrastructure Cost Calculator uses 11 inputs: Total Acres, Number of Developable Lots, Grading Cost Per Acre, Road Construction Cost Per Linear Foot, Road Linear Footage, Water and Sewer Cost Per Lot, Dry Utilities Cost Per Lot, Drainage Cost, Landscaping and Parks Cost, Permits and Engineering and Contingency. Each field starts with a preset value that you can replace with your own numbers.
It reports Total Horizontal Cost (no contingency), Total with Contingency, Cost Per Lot, Cost Per Acre, Grading Subtotal, Roads Subtotal, Water and Sewer Subtotal and Dry Utilities Subtotal.
Yes. The Horizontal Infrastructure Cost Calculator is free, needs no account, and calculates instantly in your browser. The numbers you enter are not sent to our servers.
This page is part of Real Estate Calculator, the comprehensive library of professional real estate calculators.